PrimeCraftSurface Solutions
A finished marble bathroom with a brass shower by PrimeCraft Surface Solutions

Bathrooms

Bathroom and en-suite fitting in Londonfrom a simple refit to a full wet room.

Compact shower rooms, family bathrooms and walk-in wet rooms, tanked, tiled and plumbed by the same crew, with a same-day itemised quote so the spec and the cost are clear before anything begins.

What the job covers

One team, one room,sorted properly.

Full bathroom refits

01

Full bathroom refits

Strip-out to finish covers first-fix plumbing and electrics, boarding, tiling, second fix and the final seal. One project manager runs the lot, so nothing falls between trades.

Wet rooms

02

Wet rooms

Tanked and waterproofed, with the floor screeded to fall so the water finds the drain. This is the part that fails when it's rushed, so it's the part we don't rush.

Tiling and stone

03

Tiling and stone

Large-format porcelain, natural stone, micro-cement and mosaic, all set out from the centre, mitred at the corners, with grout lines that actually line up. Heavy stone gets the floor built up to carry it first.

Fitted vanities and storage

04

Fitted vanities and storage

Vanity units and storage built to your dimensions in oak, walnut or a painted finish, with undermount basins and soft-close runners. The storage fits the room, instead of the room working around a stock unit.

Underfloor heating

05

Underfloor heating

Electric mats or water-fed loops under stone or ceramic, zoned and run off their own thermostat. A warm floor, and one less radiator taking up wall space.

Lighting and extraction

06

Lighting and extraction

Layered lighting on separate switches for mirror, ceiling and accent, plus IP-rated fittings in the wet zones and quiet, humidity-triggered extraction to keep damp and mould down.

Bathroom questions

Beforeyou start.

  • Most London bathrooms take three to five weeks on site. A like-for-like suite swap can be done in one to two weeks; a full wet room (tanking, fall-to-drain screed and underfloor heating) usually runs four to six weeks. We hand you a dated schedule at the quote stage and plan the trades around it, so you know which week the tiling lands and which week you get the room back.

Coverage

Where we work in London.

Every London borough — 33 in total. Tap a borough to see its coverage page, with local postcodes, typical project types and the housing stock we work on most often there.

Each area has its own coverage page with local planning notes and the project types we handle most often there.

Start your bathroom

Tell us about your bathroom.

A few quick details so we can turn around an accurate, itemised quote within 48 hours.

01 — About you

02 — About the bathroom

03 — Anything else

We’ll only use your details to reply to this enquiry.